New Sod Lawns in Westchester County and Putnam
Sod gives you a finished lawn on the day it is laid. What it looks like a month later comes down to the ground we put underneath it and the water you put on it in the first two weeks.
Sod or seed: how to actually choose
Sod is a finished lawn the day it goes down. It is grown on a farm, cut with about half an inch of soil attached, and laid over prepared ground. On a slope it holds soil immediately, which matters on the graded banks and cut driveways all over northern Westchester, where a bare seedbed can wash into the street in one hard summer storm. It is also the practical choice when kids and dogs use the yard and you cannot rope it off for two months.
Seed costs materially less and opens up grass types no sod farm around here grows in quantity. The trade is time and risk. Seed needs a long establishment window, weeks of light frequent watering, and it competes with every crabgrass and broadleaf seed already in your soil. On anything steeper than a gentle pitch, seed and loose topsoil move downhill before roots catch.
A flat back yard in early September with no deadline is a seeding job, and we will say so. A front bank that has been washing for two years is a sod job, and seeding it again is money spent twice.
What happens before the first roll goes down
Most failed sod jobs were lost before the sod arrived on the truck. Good sod over bad ground buys you a green lawn for about six weeks, and then the seams open and it goes off color in patches. We strip the old lawn rather than till it under, because tilling weeds and old thatch back into the profile plants them under your new grass.
What a proper base under sod involves:
- Stripping and hauling the old turf, weeds, and leftover construction debris
- Correcting the grade first, so water runs away from the foundation instead of pooling in the low corner
- Breaking up compacted subsoil, standard on any yard that had heavy equipment on it
- Screened topsoil where the existing ground is thin, rocky, or pure glacial till
- A soil test where the history warrants it, and lime to correct pH before anything is planted
- Raking to a fine, even seedbed, pulling the stone, and putting down a starter fertilizer
Laying it, seaming it, rolling it
Sod goes down in a running bond, the way brick is laid, so no two end joints line up across the lawn. Continuous straight seams telegraph through a finished lawn and are the first place drought shows. Joints are butted tight, never overlapped or stretched, because sod shrinks as it dries and stretched pieces leave gaps within a week.
On a slope we run the rows across the fall line rather than down it, and stake the pieces on anything steep enough to creep. The whole lawn is rolled once it is down. Rolling presses the roots into contact with the soil below, and without that contact they sit in an air gap and dry out no matter how much water you put on.
Watering is your job, and it decides the outcome
We will be direct, because this is the part most contractors leave vague. Once we drive away, watering is the single biggest determinant of whether the lawn takes. We can do everything else right and still lose it to one dry week.
New sod needs the soil under it kept consistently damp, not soaked and not allowed to dry, for the first ten to fourteen days. That means water every day, and twice a day in real heat. Lift a corner in a few places to check. If the soil underneath is dry, you are behind. After two weeks, shift to fewer and longer waterings, which is what pulls roots down instead of keeping them shallow.
First mow is usually two to three weeks in. Tug a corner, and if it holds rather than lifts, it is rooted enough to cut. Set the blade high and take no more than a third of the blade height. Full root-in runs about four to six weeks. Keep heavy traffic and furniture off it for the first month while the ground is still soft.
Recent work
How the estimate works
- 1Tell us what you need
- 2Walk the property with Nelson
- 3Receive a written scope and price
- 4Schedule the work
Common questions
If yours is not here, call (914) 486-3682. Someone answers seven days a week.
It moves on square footage, on how much site prep the yard needs, and on how much soil has to be trucked in. Stripping a dead lawn and regrading is a far bigger job than laying sod on ground that is already flat and clean, and access matters, since a yard a machine cannot reach gets moved by hand. Nelson walks the property and writes a scope, usually within 24 hours of your call, at no charge.
Light foot traffic is generally fine after about two weeks, once the sod has knit down and stops lifting at the corners. Keep dogs, play and anything heavy off it for the first month. The ground stays soft while you are watering daily, so early traffic leaves ruts you will see all season.
Every day for the first ten to fourteen days, twice a day in a hot stretch. The goal is damp soil under the sod, not standing water on top of it. Lift a corner and feel it to check. After two weeks, go to fewer and longer waterings. This is the part that decides whether the lawn takes. We walk you through the schedule on install day.
Related work we do
Most properties need more than one of these. One call covers all of them.
What clients say
Baudi consistently does an awesome job for us. They are very reliable and efficient, and Nelson is great to work with.
Consistently reliable, on schedule every week for mowing and maintenance. My lawn looks neat, healthy and professionally cared for.
Twenty minutes on site, a written price.
Send a few details and we will come out, measure, and leave you with a written price. No fee, no sales visit, no pressure to sign anything that day.
Prefer to talk? Call (914) 486-3682 or text a photo of the area. Open seven days, 7 AM – 7 PM.
- Phone
- (914) 486-3682
- Hours
- Monday to Sunday, 7 AM – 7 PM
Request received.
Nelson or someone on the crew will call you within 24 hours to set up the walkthrough. If it is urgent, call (914) 486-3682 and you will get a person.